BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//Arkus Innovation Studios//The Arkus Signal//EN
CALSCALE:GREGORIAN
BEGIN:VEVENT
UID:energytrust-lms-2026-energytrust-lms-2026-final@signal.arkusinnovations
 tudios.com
DTSTAMP:20261006T150825Z
DTSTART:20261031T000000Z
DTEND:20261031T001500Z
SUMMARY:LMS Administration and Instructional Design Project | Submit propos
 al
DESCRIPTION:LMS Administration and Instructional Design Project\nThe missed
  deadline before the deadline\nSubmit proposal\nThe notice specifies Pacif
 ic Daylight Time.\nInstructional design\, LMS administration and productio
 n evidence are central. The strongest team structure adds a credible e-lea
 rning production partner.\nConfirm that intent to bid was submitted by Sep
 tember 29 before investing in the October 30 proposal.\nhttps://www.energy
 trust.org/wp-content/uploads/2026/08/RFP-Instruct-Design-LMS-Vendor.pdf\n\
 nSource checked: 2026-10-05. Issue 04: 7 October 2026.\nPartnerships: Nadi
 a\, nadia@arkusinnovationstudios.com. https://www.arkusinnovationstudios.c
 om
URL:https://www.energytrust.org/wp-content/uploads/2026/08/RFP-Instruct-Des
 ign-LMS-Vendor.pdf
END:VEVENT
END:VCALENDAR
