SUMMARY:Naval Air Station Lemoore Military Installation Readiness Review Pr
 oject | Send written questions
DESCRIPTION:Plan for the outage before it arrives.\nNaval Air Station Lemoo
 re Military Installation Readiness Review Project.\nNo dollar consultant b
 udget or award ceiling is published in the complete RFP and exhibits. Subm
 it a firm fixed-price proposal with itemized task\, staff and subconsultan
 t costs\; 120-day price guarantee. The draft agreement compensation remain
 s blank. Federal thresholds and the broader OLDCC grant are not the consul
 tant contract value.\nPublic or private corporations\, agencies\, organiza
 tions\, associations or individuals may respond. UEI required\; proposer m
 ust not appear on California’s specified 500-largest-tax-delinquency lis
 ts. Documented military-related planning and engineering experience is exp
 ected\, with experienced staff and resources. Maintain legally required pr
 ofessional and City business licenses\; federal exclusion checks and contr
 act requirements apply. No California-headquarters requirement is stated.\
 nOptional online Q&A 30 November\, 11 a.m.–noon\; written questions 2 De
 cember\, 3 p.m. Both clocks lack explicit zones. Sealed original plus five
  copies and a USB drive must reach the City Clerk by 15 December at 3 p.m.
  Lemoore local time. No emailed or faxed proposal. Acknowledge all addenda
 . Confirm contradictory East/West street direction.\nSend written question
 s: 2 December 2026 · all-day reminder.\nWritten questions close at 3 p.m.
 \; time zone is not expressly stated. All-day reminder\; confirm the clock
  with City Clerk.\nDelivery address: Section 3 introduction says 711 E. Ci
 nnamon Drive\; explicit delivery blocks\, Section 1\, draft agreement and 
 current City contact page say 711 W. Cinnamon Drive. Confirm with City Cle
 rk before delivery.\nScope: main RFP assigns water/wastewater analysis to 
 City Engineer QK and electrical/communications analysis plus integration t
 o selected consultant. Draft agreement Exhibit A describes all four sector
 s and says final allocation must avoid duplication. Clarify priced allocat
 ion.\nSchedule: main RFP anticipates services beginning 1 February 2027 an
 d completion 30 June 2027\; draft agreement anticipates December 2026 NTP\
 , June 30 substantive completion and July 31 grant closeout. No extension 
 is guaranteed.\nScoring: Section 4.3 lists six categories totaling 100 poi
 nts\, while Section 4.9 separately states a lowest-cost-relative formula w
 orth 20 points. Their relationship is not explained.\nQuestion deadline an
 d optional session clock times are stated without an explicit time zone\; 
 use all-day reminders and confirm the event clock with the City. Proposal 
 cover explicitly says local time\, mapped to Lemoore America/Los_Angeles.\
 nOfficial information: https://www.lemoore.gov/DocumentCenter/View/1373/RF
 P---NAS-Lemoore-Installation-Readiness-Review-with-Exhibits\nApplication: 
 https://www.lemoore.gov/266/Bids-RFPs\nSources checked 2026-11-10.\nDiscus
 s working together: nadia@arkusinnovationstudios.com\nhttps://www.arkusinn
 ovationstudios.com
URL:https://www.lemoore.gov/DocumentCenter/View/1373/RFP---NAS-Lemoore-Inst
 allation-Readiness-Review-with-Exhibits
END:VEVENT
END:VCALENDAR